EMIS Mobile (now EMIS-X Mobile) · NHS community care · Android and iOS · Sync improvements · Shipped

Sync, seen from the clinician’s side

Sync, seen from the clinician’s side

A community nurse practitioner visiting patient’s home to provide care experiences sync as waiting. When it fails, she is left wondering whether the information in front of her is up to date.

A community nurse practitioner visiting patient’s home to provide care experiences sync as waiting. When it fails, she is left wondering whether the information in front of her is up to date.

I worked with product, clinical and engineering colleagues to make that experience clearer, easier to recover from, and better suited to a day of home visits.

I worked with product, clinical and engineering colleagues to make that experience clearer, easier to recover from, and better suited to a day of home visits.

My contribution

Research, flows, interaction design & delivery

DESIGN WINDOW

3 weeks of design exploration + alignment

Users & platforms

NHS ENGLAND, Community care

PARTNERS

Product, engineering & clinical design

Shipped in the
live application

Sync improvements for community clinicians using EMIS Mobile, now EMIS X Mobile.

A clearer model
for updates

2 weeks of design exploration + alignment

Designed for
when sync fails

My focus: progress, category status, failure feedback and recovery.

CONTEXT

Community Nurses moves between patients homes during visits. The updated record should also move with it.

EMIS X Mobile gives clinicians access to patient information when they are working away from the their General Practitioner Surgery (Clinic). Community and district nurses, health visitors and allied healthcare professionals use it to check appointments, review care records and care plans, and record the care they deliver during home visits.

Those updates need to move between the EMIS X Mobile app and EMIS Web so the wider team can work from a consistent record. That is where synchronization comes in.

A clinician might prepare for a visit, check the latest information, provide care, and save her notes before moving to the next patient. Sync sits inside that ordinary sequence. When it takes too long or fails without a clear explanation, the rest of the day has to work around it.

This work improved synchronization in the existing EMIS Mobile application, referred to in the supplied reference as now EMIS X Mobile.

Framing the problem

The sync waiting time was visible.

The uncertainty needed more attention

The existing overall sync downloads large amount of data down together: configurations, Consultation templates, Documents, Clinical resources, appointment, patient records, and medication information. The community nurse providing care at the other end of the site, waits for around 6- 10 mins to sync the sync and difficulties with inconsistent connectivity.

The extended waiting time where the only part of the problem. It would not answer the questions clinicians faced when an update was incomplete: what had arrived, what was still missing, and whether another attempt was needed at the time during the sync.

I framed the design around those moments. The goal was to help clinicians understand the state of their information and the next action, while reducing unnecessary interruption to their day.

Before the visit

Clinicians needed to review the patient’s context before making home visits.

When the sync fails

They needed to distinguish a complete update from a partial failure.

A clear route forward

When the sync failed, the app needed to explain what required attention and how to recover.

For the business, this was central to the value of mobile working. Repeated waiting reduced the usefulness of the application during visits. Unclear errors could also create support demand that better feedback might prevent.

How could we make a more selective sync model understandable, dependable and easier to fit into a clinician’s working day?

CLINICIAN INTERVIEW

Understanding the day before designing the solution.

I began with desk research and a demonstration from engineering to understand the existing sync process. The initial stakeholder discussion explained how the system would change, but I left questions about how clinicians would experience that change.

So, I arranged a separate discussion call with Ian Bailey, the clinical design director of EMIS Health, Practice Nurse at NHS Community care Centre. I focused on what prompted a sync, what people expected out of it and how they responded when it failed. This gave the technical discussion a clearer connection to daily practice.

Where it hurts

Turning the workflow in to a shared experience.

I mapped the clinician’s day across six stages, from preparing for the home visit to writing up afterwards, For each stage I captured goals, actions, pain points, emotions, opportunities and the business goal behind them.

The emotional graph told the story quickly. Confidence drops while she waits and reaches its lowest point when sync fails, just as she needs the latest information before giving care. I used that insight to shift the discussion from a single sync action to the sequence around it: preparation, progress, interruption and recovery.

Drop in: 01-journey-full-board.png

Goal: to see where effort, risk and uncertainty appear across the full journey.

Research artefact · Goals, pain points and opportunities before, during and after sync. Select to enlarge.

Synthesis & Alignment

Getting aligned

Using difficult scenarios to expose missing decisions

I then facilitated a workshop with product, design and engineering. We worked through the minimum information needed to start a visit, frequently used data versus less frequently used resources, and options for progress and failure feedback.

I brought negative scenarios into the discussion early: no connection, timeout, access errors, partial completion and leaving the sync screen. These scenarios exposed decisions that a success-only flow would have left unresolved.

The aim was to get a shared understanding. The board gave us a common reference when later decisions came up, especially around what should update, what feedback to show and how recovery should work.

Drop in: 02-workshop-full-board.png

Goal: to create a shared understanding across product, clinical and engineering teams for sync improvement ideas.

Workshop artefact · A shared reference for data priorities, design directions and error scenarios. Select to enlarge.

Ideation

Choosing the path.

“Why not go with the first idea that looked right?”

The team’s technical approach separated data that had previously been brought down together. First time sync - named the overall sync still needed a broader download. For returning users, the specification prioritized today’s appointments and associated patient records, with separate on-demand updates for organization configuration, clinical resources, and medication data.

My task was to make that new model understandable. If categories update separately, clinicians need to see their individual status. If one fails, they need to know which one, what that means and where to go next.

With the problem and team thinking on table, I explored three ideas and an end-to-end flow side by side. They covered progress, failure, retry and the notification that reaches a clinician after she has moved to another screen.

Putting the option next to each other made the trade-offs visible. Some gave more control but cost more taps. Others were simple but left too much unexplained.

Choose the resource to update

Decide on the categories to be available individually

→

→

Sync progress visibility

Give feedback to the users regarding the sync running continuously.

→

→

Understand the result

Show what happened to the sync: either they synced successfully or failed.

→

→

Find a way back

Make the report and retry route clear.

Drop in: 03-exploration-full-board.png

The project records prototype testing with key stakeholders, clinical design director along with Information Governance team, as well as direct work with engineers during implementation. The boards include explored options; they do not establish that every variant shipped.

Design THINKING

I challenged the product behaviour behind the technical dependency

Why should a clinician initiate a daily sync when these resources rarely changed?

I approached this as a question of product value: because the proposed optimization introduced a recurring responsibility for the user. Separating the data could reduce downloading, but clinicians still had to remember to retrieve resources without knowing whether anything had changed.

Product explained that the user’s action triggered the cloud to fetch updates from EMIS Web. Without that request, clinicians could miss the latest resources.

Their response made the dependency explicit. I kept the design question in focus: should that dependency determine a daily task for clinicians, or should we reconsider how the product kept resources current?

I also examined what automation would mean within the existing behaviour. Sync restricted adding, editing and deleting. Automatically triggering the same operation could therefore block documentation at an unexpected moment. A useful solution needed to address retrieval timing and continuity of work together.

The product goal I used to frame the work

Keep resources sufficiently current while asking clinicians to do as little routine maintenance as possible.

This connected the performance improvement to a broader outcome: less effort and interruption in the working day.

PRODUCT ROADMAP

That was the connection I made to the roadmap I was following.

EMIS Mobile was being rebuilt to EMIS X Mobile. The opportunity was to assess this deeper behavior alongside the replacement platform’s data and workflow design, while delivering meaningful improvements to the application clinicians were using today.

I recommended two connected priorities. For the current release, make selective sync understandable through category status, progress, clear restrictions and recovery. For the rebuild, reassess the manual dependency and how updates could happen with less clinician effort and interruption.

The roadmap gave me a basis for questioning where deeper investment would provide lasting value. It did not remove the burden of the current task.

My contribution was to expose the user consequences of a technical decision, connect them to the wider product direction, and turn that understanding into a recommendation about release priorities and future investment.

The current release

I led the immediate design response.

For the existing user-triggered flow, I prioritised category-level status, last-synced information, progress and recovery. I recommended onboarding and explored persistent guidance because a required task needed to be understandable and discoverable.

The specification recommended syncing before the shift or before a home visit. I used that preparation context to explain the current behaviour, while recognising that guidance could help someone remember the task without removing its burden.

I also clarified that clinicians could browse during sync but could not add, edit or delete. Starting the same operation automatically could therefore introduce an unexpected restriction during documentation. Automation needed to account for interruption as well as the trigger.

Design decision

Where the strategy
became interaction design.

Each choice addressed a consequence of the new model. The aim was to make separate updates easier to understand and recover from.

01 Sync Status

One timestamp could no longer explain every update.

I explored category-level status and last-synced information so a completed update would not imply that every resource had refreshed.

This made the split data model visible to the clinician. A timestamp described the last completed sync; it did not guarantee that no newer information existed elsewhere.

Product review

Completed

PXD review

In progress

Engineering review

Completed

02 Placement

Settings needed a route to discovery.

Clinical design approved Settings / Preferences for these less frequently accessed resources. I raised the discovery risk created by recommending a daily action there.

I connected placement with onboarding and guidance, so the user would understand when and why to visit those controls.

Product review

Completed

PXD review

In progress

Engineering review

Completed

03 Failure

A partial failure needed a specific explanation.

I explored a report separating successful resources from incomplete ones, with functional names and a route to retry.

The detail had to support an action. Generic unresolved errors could still require support; technical diagnostics alone would not explain the next step.

Product review

Completed

PXD review

In progress

Engineering review

Completed

04 Attention

A failure should remain noticeable after leaving Settings.

I explored persistent contextual feedback rather than automatically opening a report over the task in progress.

Engineering constrained detailed error viewing to the on-demand screen. The design therefore needed a visible signal and a route to the detail. Reminder and retry variants remained explorations.

Product review

Completed

PXD review

In progress

Engineering review

Completed

05 Effort

Updating three categories should not require three unexplained routines.

I proposed “Sync all” alongside individual controls, while retaining granular feedback for partial completion.

Development confirmation was pending in the decision log. I present it as a proposal rather than a confirmed shipped feature.

Product review

Completed

PXD review

In progress

Engineering review

Completed

DELIVERY & OUTCOMES

The improvements shipped.
The evidence has a clear boundary.

The improvements shipped. The evidence has a clear boundary.

The overall sync improvements launched in the live application. I contributed the research, design direction and interactions around the revised model, working with product, clinical and engineering colleagues through review and implementation.

The artefacts show the value I added: a clinician-centred problem definition, scenarios that exposed missing decisions, options for progress and recovery, and a documented challenge to the daily manual action.

Delivered

The overall sync improvements reached the live application.

Made explicit

Category states, recovery paths and the limits of working during sync.

Recommended

A direction for reducing maintenance effort, linking the current release to automation questions for the rebuild.

Measurement scope. Validated before-and-after measures of waiting time by live testing with community nurses and reported from the product end. But recovery success and clinical outcomes specific to this work were not available to me. The journey map’s 6–10-minute wait is a research pain point, is a measured result of the release. Individual proposals are distinguished from confirmed delivery.

REQUIREMENTS CARRIED FORWARD

Establish when an update is needed before asking someone to act.

I would work with clinical, Product and engineering colleagues to establish how current each resource needed to be at the point of use. Infrequent access and infrequent change are different: neither alone determines an appropriate sync schedule.

I would then investigate whether the system could identify available changes, retrieve them at an appropriate time and request intervention only when needed. Those are options to validate against the architecture and clinical workflow, not capabilities demonstrated by this release.

I would use missed updates, repeated checks with nothing new, interruptions during documentation and recovery failures to assess whether the user burden was actually improving.

My value was to question the recurring task behind the feature, make its consequences explicit and connect the release design to a longer-term product goal. I helped the team distinguish making sync faster from making it less work for the clinician.

What this strengthened in my practice

What this strengthened in my practice

I became more deliberate about identifying the level at which a problem needed attention: a clearer message, a different interaction, a release priority or an architectural question.

It triggered the intrapreneurial part within me. I followed the product beyond the requested screens and brought opportunities into discussion with a reasoned recommendation about where to act. Architecture, clinical approvals and delivery remained shared responsibilities.

EMIS X Mobile · Sync improvements · Shipped work

EMIS X Mobile · Sync improvements · Shipped work